Aviation Fuel Price 
24/7 Self Serve 100LL Aviation Fuel

$4.66 per gallon
$4.56 per gallon with Shell Aviation Card

POSTED: 08/31/2018

NOTE: Self serve facility located at southeast corner of airport in front of Administration Building. Restroom facility and Pilot Briefing are also available.

CTAF/UNICOM 123.05

Search Site

HOME PAGE

Welcome to the Sebastian Airport,   "FLORIDA'S BOUTIQUE AIRPORT". 

 AIRPORT PROFILE

Sebastian Municipal Airport (FAA Designator X26) is located on the north west side of the City of Sebastian, on the east coast of Florida, between Vero Beach and Melbourne. It is a General Aviation (GA) facility, serving primarily small personal and corporate aircraft. It has two runways (RWY 5-23 and RWY 10-28), the longest of which is 4,000 feet in length. We have ten airport tenants, including Sebastian Municipal Golf Course, a first class, City-owned, public facility.

 APTALL1

                   Google Map of Sebastian Municipal Airport as of March 2013

 052013AptPixIRByAir

                April 2013 view of newly remarked runways at the Sebastian Municipal Airport

In recent years, the Sebastian Municipal Airport has seen a vast amount of infrastructure improvements. Some of these include:

 
052013AptCompRoseIRByAir
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
ADS-B_Tower
  • Medium Intensity Runway Lighting (RWY 5-23)
  • Complete Perimeter Fencing with five electric gates
  • Water and Sewer Utility Extensions
  • Underground Three-phase Power
  • Construction of 40 T-hangars
  • Construction of General Aviation Terminal and Administrative Offices
  • Numerous Security Upgrades (Proximity Badges, Cameras, Fiber Optics)
  • Rehabilitation of Taxiway "A"
  • Construction and Activation of Runway 10-28
  • Implementation of SuperAwos Sebastian Airport CTAF/UNICOM 123.05
  • Installation of PAPI Approach Light System on all runways
  • Installation of 24/7 self serve aviation gas system adjacent to Airport Administration Building on the southeast ramp of the Airport
  • Construct new airport maintenance building for all airport equipment
  • ADS-B Next Gen Tower installation and activation.
  • Completion of new LoPresti Aviation manufacturing facility and hanger.
  • Completed project to add new roadway, taxiway and infrastructure on east of airport using FDOT grant. This will provide future space for hangers and light manufacturing.
  • FDOT/FAA grant to rehabilitate Runway 5-23 completed March 1, 2010
  • Florida DOT grant for second new hanger/manufacturing facility of up to $1.45 million. Hanger completed October 2011.
  • Installation and operation in January 2012 of two wind turbine generators to reduce electric costs at the Airport facility
  • Fall 2012 the FAA published GPS approaches for Runways 5-23.
  • Remarking/redesignation of all runways as well as reconstitution of taxiways and overruns completed January 2013.
  • Eastside renovation with new entrance road/landscaping, new location for golf course maintenance building and building sites for new small businesses. This project will be completed by early 2016.
  • Construction of a new Hanger C to be completed by spring 2016.

Additionally, Airport Development Guidelines have recently been published to clarify and streamline the entire leasing process and assist prospective tenants throughout their site development.